Our References

All Project

2005-8

HRL

Pumping Systems For HRL Projects
Supply, Installation, Testing & Commissioning of Multiple Water Supply & Installation of Sewage Pumps for different projects of HRL like:

2007

Nestle

Electro Mechanical Equipment at WWTP of Nestle Kabirwala
Supply, Installation, Testing & Commissioning of Electro Mechanical Equipment Like;

2008

Fatima Fertilizer

Ammonia Refrigeration Compressor
Supply of Ammonia Refrigeration Compressor

2008

Hashwani Hotels Limited

Fire Hydrant Pumps at Marriot Hotel Islamabad
Supply, Installation, Testing & Commissioning of Fire Hydrant Pumps at Marriot Hotel Islamabad.

2007

Descon Engineering Limited

Mechanical Works Related to 10 MGD Water Treatment Plant at Engro Daharki
Supply, Installation, Testing & Commissioning of Mechanical Items related to Water Treatment of 10 MGD For Engro Daharki

2008

Descon Engineering Limited

Submersible pumps
Supply, Installation, Testing & Commissioning of submersible pumps for maasive dewateribng of Taunsa Barrage dewatering.

2008

Echo West International

Tubewell Pumping System For Fauji Fertilizer Company, Daharki

Design & Supply of Pumping System For Tubewell Applications at Fauji Fertilizer Company Limited, Daharki

2007

NP Construction & Engineering

Submersible Waste Water Pumps
Supply of Submersible wastewater pumps

2008

Liaquat & Company

Submersible Waste Water Pumps
Supply of Submersible Wastewater Pumps for DG Khan Disposal Station at Pyary Wali Pul.

2009

QIH

400 M3/Day WWTP, Fire Detection & Firefighting system & Water Supply Pumps
Supply, Installation, Testing & Commissioning of:

2009

SKB Engineering & Construction

Supply of Gear Oil Pumps
Supply of American Marsh Gear Oil Pumps

2010

Emaar, Islamabad

Booster Pumps
Supply of 254 booster pump sets for EMAAR CANYON VIEWS HOUSING PROJECT.

2010

PINSTECH

Addressable Fire Alarm System
Supply, Installation, testing & Commissioning of Addressable Fire Alarm System at Nilore

2010

Al-Mansoor International

Fire Hydrants
Supply of Fire Hydrants

2010

PMO

Tubewell pumps for PMO
Supply, Installation, Testing & Commissioning of Tubewell Pumps

2009

Punjab Industrial Estate

O&M of Submersible Sewage Pumps
Operation & Maintenance of Temporary Disposal Station at Sundar Industrial Estate

2010

Izhar Construction

Supply & Installation of Pumping System
Supply, Installation, Testing & Commissioning of Pumping System at SAB Jacobabad site.

2010

Punjab Industrial Estate

Submersible Pumps at Disposal Station
Supply, Installation, Testing & Commissioning of Submersible Sewage Pumps at Sundar Industrial Estate Disposal Station

2010

Rainmakers

Water Supply Pumps
Supply, Installation, Testing & Commissioning of Pressure Boosting Pumping Set

2010

Habib Rafiq Limited

Mechanical Works Related to 5 MGD WasteWater Treatment Plant For New Mirpur City
Supply, installation, testing & Commissioning of Mechanical Items related to WasteWater Treatment of 5 MGD For New Mirpur City

2011

Metro Cash N Carry

80 M3/Day WWTP At Metro Stores
Package Type WWTPs at Metro Cash N Carry Stores at;

2011

WASA

Submersible Sewage Pumps
Supply, Installation, Testing, Commissioning of Submersible Sewage Pumps at Dharampura Disposal Station

2011

Al-Hamra Avenue

Hydraulic Analysis of Water Supply System
Hydraulic Analysis of Water Supply System For Al-Hamra Hills & Avenue

2011

Minawa Constructions

380 M3/Day WWTP At Islamabad Country Club Apartments
Complete EPC of Package Type WWTP

2011

PAEC

Firefighting System
Supply, Installation, Testing & Commissioning of Firefighting System at H-Block CMT Site

2011

WAPDA

Drainage Pumps at Tarbela Power Station
Supply, Installation, Testing & Commissioning of Drainage Pumps at Tarbela Power Station.

2011

CAA

6800 M3/Day WWTP At BBIA

Activated Sludge with rapid sand filters

2011-12

Nestle

5500 M3/Day WWTP at Nestle Sheikhupura
Activated Sludge with UF Membrane 5,500 m3/Day, SCADA System For Controlling of Plant Water Reusable For Cooling Tower Purpose

2012

CMT

Fire Alarm System
Supply, Installation, Testing & Commissioning of Addressable Fire Alarm System

2012

PTET

Water Supply Pumps
Supply, Installation, Testing & Commissioning of Water Supply Pumps

2012

CSD

Fire Detection & Suppression System
Supply, Installation, Testing & Commissioning of:

2011-13

Dr. A.Q Khan Research Laboratories

Fire Alarm System
Supply, Installation, Testing & Commissioning of Addressable Fire Alarm System

2013

PINSTECH

Fire Alarm System
Supply, Installation, Testing & Commissioning of Addressable Fire Alarm System

2013

PAEC

Fire Suppression System
Supply, Installation, Testing & Commissioning of Fire Suppression System at A-Block CMT Site-3

2013

Pakistan Tobacco Company

Fire Suppression System

Supply, Installation, Testing & Commissioning of Fire Suppression System

2013

WASA, Lahore

Submersible Pumps at Disposal Station
Supply, Installation, Testing & Commissioning of Pumps For Disposal Station at Dharampura & Barkat Market

2013

PAEC

Remote Monitoring of Tubewells / Disposal Stations
Supply, Installation, Testing & Commissioning of Remote Monitoring, Control & Interconnectivity System for WASA Tubewells / Disposal Stations / Lift Stations & Generators

2013

National Institute of Vacuum Science & Technology

Fire Pumps
Supply, Installation, Testing & Commissioning of Fire Pumps

2013

Al-Siddique Developers

200 M3/Day WWTP At Paradise Valley Phase II
Complete EPC of Package Type WWTP

2014

DESTO

Fire Alarm & Hydrant System
Supply, Installation, Testing & Commissioning of:

2014

Fauji Fresh N Freeze

Complete Waste Management System at Fauji Fresh N Freeze (FFF)
WWTP based on Upflow Anaerobic Sludge Blanket (UASB) Technology.
 Methane Gas is obtained as By-Product
 Waste Management System Comprises:

2015

CWE

Electro-Mechanical work of 2 x 4 MGD WTP at Muzaffarabad
Supply, Installation, Testing & Commissioning of;

2015

Unilever

60 M3/Day WWTP at United Detergents
Complete EPC of Package Type WWTP.
 Our Scope includes;

2016

Punjab Daanish Schools

Upgradation of Punjab Daanish School Rahim Yaar Khan
Upgradation of Punjab Daanish School Rahim Yaar Khan;

2016

Coca Cola Beverages

O & M of WWTP
O&M of WWTP For 01 Year

2016

Gharibwal Cement

Water Supply Line at Gharibwal Cement
Installation, Testing & Commissioning of 14″ & 12″ Steel Reinforced HDPE Water Supply Pipeline with a cumulative length of 18.6 Kms.

2016

Al-Siddique Developers

Fire Alarm System
Supply, Installation, Testing & Commissioning of Addressable Fire Alarm System

2016

MOL Pakistan Oil & Gas BV

Troubleshooting of Effluent Treatment Plant
Services for Troubleshooting & Commissioning of Effluent Treatment Plant at MOL Pakistan Central Processing Facility Karak.

2017

DG Cement

Water Supply Line at DG Cement
Installation, Testing & Commissioning of 14″ & 12″ Steel Reinforced HDPE Water Supply Pipeline from Winder to DG Cement Plant Site with a length of 13 Kms.

2017

DG Cement

Water Supply Line at DG Cement
Installation, Testing & Commissioning of 14″ & 12″ Steel Reinforced HDPE Water Supply Pipeline from LEIDA To DG Cement Plant Site with a length of 10 Kms.

2018-19

AB Mauri Pakistan

267 M3/Day WWTP at AB Mauri Pakistan (Pvt.) Ltd., Lahore
Complete EPC of Membrane Based WWTP.
Our Scope includes;

2019

Govt. of KPK

150 M3/Day WWTP at BRT Depot, Peshawar
Complete EPC of Package Type WWTP.
 Our Scope includes

2021

Highnoon Pharmaceuticals, Lahore

120 M3/Day WWTP at Highnoon Pharmaceuticals
Complete EPC of Package Type WWTP.
 Our Scope includes;

2021

Directorate of Design and Consultancy (DDnC)

40,000 GPD WWTP at CCQ
Complete EPC of Package Type WWTP.
 Our Scope includes;

2021

PEPSI Pakistan

FFP Study at PEPSI Sundar Plant
Fit-For-Purpose Study For Reviewing ETP Performance and suggesting recommendations for improvement.

ON-GOING

Sialkot Tanneries Association Limited

Electro-Mechanical Works of 4,000 M3/Day CETP at Sialkot Tanneries Zone
Design, Supply, Installation, Testing & Commissioning of 4000 M3/Day CETP at Sialkot Tanneries Zone;
Scope includes:

2023

Orbit Developers

250 M3/Day WWTP at Springs Apartments, Lahore
Complete EPC of Package Type WWTP.
 Our Scope includes

ON-GOING

Future Development 
 Holding Islamabad

10,227 M3/Day WTP at Capital 
Smart City, Islamabad.
Complete EPC of Membrane based Water Treatment Plant, with total two stage design of 20,254 M3/Day

2023

SKMCH & RC

18 M3/Day WWTP at Shaukat Khanum Cancer Hospital & Research Center
Complete EPC of Biological WWTP for Treatment of Laboratory Wastewater

2024

IDAP

120 M3/Day WWTP at SFMBIC DG Khan
Complete EPC of Biological WWTP for Treatment of Hospital Wastewater

ON-GOING

Lahore Smart City

3,768 M3/Day STP at Lahore Smart City
Complete EPC of Membrane Based WWTP.
 Our Scope includes

ON-GOING

IDAP

240 M3/Day WWTP at PAFDA-PFSA Lahore
Complete EPC of Biological WWTP for Treatment of Hospital Wastewater

Wastewater Treatment

2007

Nestle

Electro Mechanical Equipment at WWTP of Nestle Kabirwala
Supply, Installation, Testing & Commissioning of Electro Mechanical Equipment Like;

2010

Habib Rafiq Limited

Mechanical Works Related to 5 MGD WasteWater Treatment Plant For New Mirpur City
Supply, installation, testing & Commissioning of Mechanical Items related to WasteWater Treatment of 5 MGD For New Mirpur City

2011

CAA

6800 M3/Day WWTP At BBIA
Activated Sludge with rapid sand filters

2011-12

Nestle

5500 M3/Day WWTP at Nestle Sheikhupura
Activated Sludge with UF Membrane 5,500 m3/Day, SCADA System For Controlling of Plant Water Reusable For Cooling Tower Purpose

2014

Fauji Fresh N Freeze

Complete Waste Management System at Fauji Fresh N Freeze (FFF)
WWTP based on Upflow Anaerobic Sludge Blanket (UASB) Technology. Methane Gas is obtained as By-Product Waste Management System Comprises:

2018-19

AB Mauri Pakistan

267 M3/Day WWTP at AB Mauri Pakistan (Pvt.) Ltd., Lahore
Complete EPC of Membrane Based WWTP.
Our Scope includes

ON-GOING

Sialkot Tanneries Association Limited

Electro-Mechanical Works of 4,000 M3/Day CETP at Sialkot Tanneries Zone
Design, Supply, Installation, Testing & Commissioning of 4000 M3/Day CETP at Sialkot Tanneries Zone;
Scope includes:

2023

SKMCH & RC

18 M3/Day WWTP at Shaukat Khanum Cancer Hospital & Research Center
Complete EPC opf Biological WWTP for Treatment of Laboratory Wastewater

2024

IDAP

120 M3/Day WWTP at SFMBIC DG Khan
Complete EPC opf Biological WWTP for Treatment of Hospital Wastewater

ON-GOING

Lahore Smart City

3,768 M3/Day STP at Lahore Smart City
Complete EPC of Membrane Based WWTP.
 Our Scope includes;

ON-GOING

IDAP

240 M3/Day WWTP at PAFDA-PFSA Lahore
Complete EPC opf Biological WWTP for Treatment of Hospital Wastewater

Package Type Treatment Plants

2009

QIH

400 M3/Day WWTP At QIH, Islamabad
Supply, Installation, Testing & Commissioning of:

2011

Metro Cash N Carry

80 M3/Day WWTP At Metro Stores
Package Type WWTPs at Metro Cash N Carry Stores at;

2011

Minawa Constructions

380 M3/Day WWTP At Islamabad Country Club Apartments
Complete EPC of Package Type WWTP

2013

Al-Siddique Developers

200 M3/Day WWTP At Paradise Valley Phase II
Complete EPC of Package Type WWTP

2015

Unilever

60 M3/Day WWTP at United Detergents
Complete EPC of Package Type WWTP.
Our Scope includes

2019

Govt. of KPK

150 M3/Day WWTP at BRT Depot, Peshawar
Complete EPC of Package Type WWTP.
Our Scope includes;

2021

Highnoon Pharmaceuticals, Lahore

120 M3/Day WWTP at Highnoon Pharmaceuticals
Complete EPC of Package Type WWTP.
Our Scope includes

2021

Directorate of Design and Consultancy (DDnC)

40,000 GPD WWTP at CCQ
Complete EPC of Package Type WWTP.
Our Scope includes

2023

Orbit Developers

250 M3/Day WWTP at Springs Apartments, Lahore
Complete EPC of Package Type WWTP.
Our Scope includes

Water Treatment

2008

Descon Engineering Limited

Mechanical Works Related to 10 MGD Water Treatment Plant at Engro Daharki
Supply, Installation, Testing & Commissioning of Mechanical Items related to Water Treatment of 10 MGD For Engro Daharki

2015

CWE

Electro-Mechanical works of 2 x 4 MGD WTP at Muzaffarabad
Supply, Installation, Testing & Commissioning of;

ON-GOING

Future Development 
 Holding Islamabad

10,227 M3/Day WTP at Capital 
Smart City, Islamabad.
Complete EPC of Membrane based Water Treatment Plant, with total two stage design of 20,254 M3/Day

Water Supply Pumping & Pipelines

2005-8

HRL

Pumping Systems For HRL Projects
Supply, Installation, Testing & Commissioning of Multiple Water Supply & Installation of Sewage Pumps for different projects of HRL like:

2008

Fatima Fertilizer

Ammonia Refrigeration Compressor
Supply of Ammonia Refrigeration Compressor

2008

Descon Engineering Limited

Submersible pump
Supply, Installation, Testing & Commissioning of submersible pumps for massive dewatering of Taunsa Barrage.

2008

Echo West International

Tubewell Pumping System For Fauji Fertilizer Company, Daharki
Design & Supply of Pumping System For Tubewell Applications at Fauji Fertilizer Company Limited, Daharki

2008

NP Construction & Engineering

Submersible Waste Water Pumps
Supply of Submersible wastewater pumps

2008

Liaquat & Company

Submersible Waste Water Pumps
Supply of Submersible Wastewater Pumps for DG Khan Disposal Station at Pyary Wali Pul.

2009

SKB Engineering & Construction

Supply of Gear Oil Pumps
Supply of American Marsh Gear Oil Pumps

2010

Emaar, Islamabad

Booster Pumps
Supply of 254 booster pump sets for EMAAR CANYON VIEWS HOUSING PROJECT.

2010

PMO

Tubewell pumps for PMO
Supply, Installation, Testing & Commissioning of Tubewell Pumps

2009

Punjab Industrial Estate

O&M of Submersible Sewage Pumps
Operation & Maintenance of Temporary Disposal Station at Sundar Industrial Estate

2010

Punjab Industrial Estate

Submersible Pumps at Disposal Station
Supply, Installation, Testing & Commissioning of Submersible Sewage Pumps at Sundar Industrial Estate Disposal Station

2010

Izhar Construction

Supply & Installation of Pumping System
Supply, Installation, Testing & Commissioning of Pumping System at SAB Jacobbabad site.

2010

Rainmakers

Water Supply Pumps
Supply, Installation, Testing & Commissioning of Pressure Boosting Pumping Set

2010

WASA

Submersible Sewage Pumps
Supply, Installation, Testing, Commissioning of Submersible Sewage Pumps at Dharampura Disposal Station

2010

Al-Hamra Avenue

Hydraulic Analysis of Water Supply System
Hydraulic Analysis of Water Supply System For Al-Hamra Hills & Avenue

2011

WAPDA

Drainage Pumps at Tarbela Power Station
Supply, Installation, Testing & Commissioning of Drainage Pumps at Tarbela Power Station.

2012

PTET

Water Supply Pumps
Supply, Installation, Testing & Commissioning of Water Supply Pumps

2013

WASA, Lahore

Submersible Pumps at Disposal Station
Supply, Installation, Testing & Commissioning of Pumps For Disposal Station at Dharampura & Barkat Market

2013

WASA, Lahore

Remote Monitoring of Tubewells / Disposal Stations
Supply, Installation, Testing & Commissioning of Remote Monitoring, Control & Interconnectivity System for WASA Tube wells / Disposal Stations / Lift Stations & Generators

2016

Punjab Daanish Schools

Upgradation of Punjab Daanish School Rahim Yaar Khan
Upgradation of Punjab Daanish School Rahim Yaar Khan;

2016

Gharibwal Cement

Water Supply Line at Gharibwal Cement
Installation, Testing & Commissioning of 14″ & 12″ Steel Reinforced HDPE Water Supply Pipeline with a cumulative length of 18.6 Kms.

2017

DG Cement

Water Supply Line at DG Cement
Installation, Testing & Commissioning of 14″ & 12″ Steel Reinforced HDPE Water Supply Pipeline from Winder to DG Cement Plant Site with a length of 13 Kms.

2017

DG Cement

Water Supply Line at DG Cement
Installation, Testing & Commissioning of 14″ & 12″ Steel Reinforced HDPE Water Supply Pipeline from LEIDA To DG Cement Plant Site with a length of 10 Kms.

Fire

2008

Hashwani Hotels Limited

Fire Hydrant Pumps at Marriot Hotel Islamabad
Supply, Installation, Testing & Commissioning of Fire Hydrant Pumps at Marriot Hotel Islamabad.

2010

PINSTECH

Addressable Fire Alarm System
Supply, Installation, testing & Commissioning of Addressable Fire Alarm System at Nilore

2010

Al-Mansoor International

Fire Hydrants pump
Supply of Fire Hydrants

2011

PAEC

Firefighting System
Supply, Installation, Testing & Commissioning of Firefighting System at H-Block CMT Site

2012

CMT

Fire Alarm System
Supply, Installation, Testing & Commissioning of Addressable Fire Alarm System

2012

CSD

Fire Detection & Suppression System
Supply, Installation, Testing & Commissioning of:

2011-13

Dr. A.Q Khan Research Laboratories

Fire Alarm System
Supply, Installation, Testing & Commissioning of Addressable Fire Alarm System

2013

PINSTECH

Fire Alarm System
Supply, Installation, Testing & Commissioning of Addressable Fire Alarm System

2013

PAEC

Fire Suppression System
Supply, Installation, Testing & Commissioning of Fire Suppression System at A-Block CMT Site-3

2013

Pakistan Tobacco Company

Fire Suppression System
Supply, Installation, Testing & Commissioning of Fire Suppression System

2013

National Institute of Vacuum Science & Technology

Fire Pumps
Supply, Installation, Testing & Commissioning of Fire Pumps

2014

DESTO

Fire Alarm & Hydrant System
Supply, Installation, Testing & Commissioning of:

2016

Al-Siddique Developers

Fire Alarm System
Supply, Installation, Testing & Commissioning of Addressable Fire Alarm System

Wastewater Treatment

2007

Nestle

Electro Mechanical Equipment at WWTP of Nestle Kabirwala
Supply, Installation, Testing & Commissioning of Electro Mechanical Equipment Like;

2010

Habib Rafiq Limited

Mechanical Works Related to 5 MGD WasteWater Treatment Plant For New Mirpur City
Supply, installation, testing & Commissioning of Mechanical Items related to WasteWater Treatment of 5 MGD For New Mirpur City

2011

CAA

6800 M3/Day WWTP At BBIA
Activated Sludge with rapid sand filters

2011-12

Nestle

5500 M3/Day WWTP at Nestle Sheikhupura
Activated Sludge with UF Membrane 5,500 m3/Day, SCADA System For Controlling of Plant Water Reusable For Cooling Tower Purpose

2014

Fauji Fresh N Freeze

Complete Waste Management System at Fauji Fresh N Freeze (FFF)
WWTP based on Upflow Anaerobic Sludge Blanket (UASB) Technology. Methane Gas is obtained as By-Product Waste Management System Comprises:

2018-19

AB Mauri Pakistan

267 M3/Day WWTP at AB Mauri Pakistan (Pvt.) Ltd., Lahore
Complete EPC of Membrane Based WWTP.
Our Scope includes

ON-GOING

Sialkot Tanneries Association Limited

Electro-Mechanical Works of 4,000 M3/Day CETP at Sialkot Tanneries Zone
Design, Supply, Installation, Testing & Commissioning of 4000 M3/Day CETP at Sialkot Tanneries Zone;
Scope includes:

2023

SKMCH & RC

18 M3/Day WWTP at Shaukat Khanum Cancer Hospital & Research Center
Complete EPC opf Biological WWTP for Treatment of Laboratory Wastewater

2024

IDAP

120 M3/Day WWTP at SFMBIC DG Khan
Complete EPC opf Biological WWTP for Treatment of Hospital Wastewater

ON-GOING

Lahore Smart City

3,768 M3/Day STP at Lahore Smart City
Complete EPC of Membrane Based WWTP.
 Our Scope includes;

ON-GOING

IDAP

240 M3/Day WWTP at PAFDA-PFSA Lahore
Complete EPC opf Biological WWTP for Treatment of Hospital Wastewater

Package Type Treatment Plants

2009

QIH

400 M3/Day WWTP At QIH, Islamabad
Supply, Installation, Testing & Commissioning of:

2011

Metro Cash N Carry

80 M3/Day WWTP At Metro Stores
Package Type WWTPs at Metro Cash N Carry Stores at;

2011

Minawa Constructions

380 M3/Day WWTP At Islamabad Country Club Apartments
Complete EPC of Package Type WWTP

2013

Al-Siddique Developers

200 M3/Day WWTP At Paradise Valley Phase II
Complete EPC of Package Type WWTP

2015

Unilever

60 M3/Day WWTP at United Detergents
Complete EPC of Package Type WWTP.
Our Scope includes

2019

Govt. of KPK

150 M3/Day WWTP at BRT Depot, Peshawar
Complete EPC of Package Type WWTP.
Our Scope includes;

2021

Highnoon Pharmaceuticals, Lahore

120 M3/Day WWTP at Highnoon Pharmaceuticals
Complete EPC of Package Type WWTP.
Our Scope includes

2021

Directorate of Design and Consultancy (DDnC)

40,000 GPD WWTP at CCQ
Complete EPC of Package Type WWTP.
Our Scope includes

2023

Orbit Developers

250 M3/Day WWTP at Springs Apartments, Lahore
Complete EPC of Package Type WWTP.
Our Scope includes

Water Treatment

2008

Descon Engineering Limited

Mechanical Works Related to 10 MGD Water Treatment Plant at Engro Daharki
Supply, Installation, Testing & Commissioning of Mechanical Items related to Water Treatment of 10 MGD For Engro Daharki

2015

CWE

Electro-Mechanical works of 2 x 4 MGD WTP at Muzaffarabad
Supply, Installation, Testing & Commissioning of;

ON-GOING

Future Development 
 Holding Islamabad

10,227 M3/Day WTP at Capital 
Smart City, Islamabad.
Complete EPC of Membrane based Water Treatment Plant, with total two stage design of 20,254 M3/Day

Water Supply Pumping & Pipelines

2005-8

HRL

Pumping Systems For HRL Projects
Supply, Installation, Testing & Commissioning of Multiple Water Supply & Installation of Sewage Pumps for different projects of HRL like:

2008

Fatima Fertilizer

Ammonia Refrigeration Compressor
Supply of Ammonia Refrigeration Compressor

2008

Descon Engineering Limited

Submersible pump
Supply, Installation, Testing & Commissioning of submersible pumps for massive dewatering of Taunsa Barrage.

2008

Echo West International

Tubewell Pumping System For Fauji Fertilizer Company, Daharki
Design & Supply of Pumping System For Tubewell Applications at Fauji Fertilizer Company Limited, Daharki

2008

NP Construction & Engineering

Submersible Waste Water Pumps
Supply of Submersible wastewater pumps

2008

Liaquat & Company

Submersible Waste Water Pumps
Supply of Submersible Wastewater Pumps for DG Khan Disposal Station at Pyary Wali Pul.

2009

SKB Engineering & Construction

Supply of Gear Oil Pumps
Supply of American Marsh Gear Oil Pumps

2010

Emaar, Islamabad

Booster Pumps
Supply of 254 booster pump sets for EMAAR CANYON VIEWS HOUSING PROJECT.

2010

PMO

Tubewell pumps for PMO
Supply, Installation, Testing & Commissioning of Tubewell Pumps

2009

Punjab Industrial Estate

O&M of Submersible Sewage Pumps
Operation & Maintenance of Temporary Disposal Station at Sundar Industrial Estate

2010

Punjab Industrial Estate

Submersible Pumps at Disposal Station
Supply, Installation, Testing & Commissioning of Submersible Sewage Pumps at Sundar Industrial Estate Disposal Station

2010

Izhar Construction

Supply & Installation of Pumping System
Supply, Installation, Testing & Commissioning of Pumping System at SAB Jacobbabad site.

2010

Rainmakers

Water Supply Pumps
Supply, Installation, Testing & Commissioning of Pressure Boosting Pumping Set

2010

WASA

Submersible Sewage Pumps
Supply, Installation, Testing, Commissioning of Submersible Sewage Pumps at Dharampura Disposal Station

2010

Al-Hamra Avenue

Hydraulic Analysis of Water Supply System
Hydraulic Analysis of Water Supply System For Al-Hamra Hills & Avenue

2011

WAPDA

Drainage Pumps at Tarbela Power Station
Supply, Installation, Testing & Commissioning of Drainage Pumps at Tarbela Power Station.

2012

PTET

Water Supply Pumps
Supply, Installation, Testing & Commissioning of Water Supply Pumps

2013

WASA, Lahore

Submersible Pumps at Disposal Station
Supply, Installation, Testing & Commissioning of Pumps For Disposal Station at Dharampura & Barkat Market

2013

WASA, Lahore

Remote Monitoring of Tubewells / Disposal Stations
Supply, Installation, Testing & Commissioning of Remote Monitoring, Control & Interconnectivity System for WASA Tube wells / Disposal Stations / Lift Stations & Generators

2016

Punjab Daanish Schools

Upgradation of Punjab Daanish School Rahim Yaar Khan
Upgradation of Punjab Daanish School Rahim Yaar Khan;

2016

Gharibwal Cement

Water Supply Line at Gharibwal Cement
Installation, Testing & Commissioning of 14″ & 12″ Steel Reinforced HDPE Water Supply Pipeline with a cumulative length of 18.6 Kms.

2017

DG Cement

Water Supply Line at DG Cement
Installation, Testing & Commissioning of 14″ & 12″ Steel Reinforced HDPE Water Supply Pipeline from Winder to DG Cement Plant Site with a length of 13 Kms.

2017

DG Cement

Water Supply Line at DG Cement
Installation, Testing & Commissioning of 14″ & 12″ Steel Reinforced HDPE Water Supply Pipeline from LEIDA To DG Cement Plant Site with a length of 10 Kms.

Fire

2008

Hashwani Hotels Limited

Fire Hydrant Pumps at Marriot Hotel Islamabad
Supply, Installation, Testing & Commissioning of Fire Hydrant Pumps at Marriot Hotel Islamabad.

2010

PINSTECH

Addressable Fire Alarm System
Supply, Installation, testing & Commissioning of Addressable Fire Alarm System at Nilore

2010

Al-Mansoor International

Fire Hydrants pump
Supply of Fire Hydrants

2011

PAEC

Firefighting System
Supply, Installation, Testing & Commissioning of Firefighting System at H-Block CMT Site

2012

CMT

Fire Alarm System
Supply, Installation, Testing & Commissioning of Addressable Fire Alarm System

2012

CSD

Fire Detection & Suppression System
Supply, Installation, Testing & Commissioning of:

2011-13

Dr. A.Q Khan Research Laboratories

Fire Alarm System
Supply, Installation, Testing & Commissioning of Addressable Fire Alarm System

2013

PINSTECH

Fire Alarm System
Supply, Installation, Testing & Commissioning of Addressable Fire Alarm System

2013

PAEC

Fire Suppression System
Supply, Installation, Testing & Commissioning of Fire Suppression System at A-Block CMT Site-3

2013

Pakistan Tobacco Company

Fire Suppression System
Supply, Installation, Testing & Commissioning of Fire Suppression System

2013

National Institute of Vacuum Science & Technology

Fire Pumps
Supply, Installation, Testing & Commissioning of Fire Pumps

2014

DESTO

Fire Alarm & Hydrant System
Supply, Installation, Testing & Commissioning of:

2016

Al-Siddique Developers

Fire Alarm System
Supply, Installation, Testing & Commissioning of Addressable Fire Alarm System